Taking in 9 million litres per day, the Clandeboye site has established itself as the second largest processing site for New Zealand’s new Fonterra Group.
The Clandeboye site on the Southeast coast of the Island was initially established as a cheese plant. In 1996, Niro (NZ) Ltd. installed UF-equipment, evaporator and a Tall Form Spray Dryer for processing WPC (rate 2 million litres whey per day).
The next plant was required to process 3 mio. litres/day of milk in MVR evaporators and a large COMPACT Niro dryer. In august 2000 Niro (NZ) was chosen to build an extremely advanced powder plant, on a turn key basis. In august 2001 the plant began operation. The new plant features three MVR evaporators, a Multi Stage drying plant with three vibrating fluid beds, sanitary bag filters, powder silos and (AVAPAC) packing lines. Total capacity: 18 tons of milk powder per hour or 12 bags per minute.

Click anywhere on our brochure to view the page in detail.

  • Drag page corners to go to previous/next page.
  • Click images to zoom.

2 Pages
1267 Kb

We use PDF-files, which require Adobe Acrobat to run.

If Adobe Acrobat is not installed on your PC, please go to Adobe's website and download the plug-in before you proceed with your download.